1.
All materials are shipped
by truck and unloaded
directly into our plant |
 |
2.
Materials are stored indoors
out of nature's elements |
 |
3.
Our computerized saw
precision sizes lumber for
floor and roof assemblies |
 |
4.
All windows and door
frames are pre-assembled |
 |
5.
Floor is constructed at
16 in. on center |
 |
6.
Finished floor decking. |
 |
7.
2x6 exterior walls and
2x4 marriage walls |
 |
8.
All interior walls are
precision built with laser technology |
 |
9.
Interior partitions being set |
 |
10.
Ceilings are constructed
16 in. on center |
 |
11.
Ceiling being set |
 |
12.
Insulation and foam seal
on ceilings |
 |
13.
Blocking for kitchen cabinets |
 |
14.
All electrical wiring is
installed to NEC code |
 |
15.
All schedule 40 drains, waste and vents are installed per code |
 |
16.
All plumbing supply lines
are copper type 'L' |